How Long Does a Kitchen Remodel Take in 2025?

Understanding the Timeline for an Entire Kitchen Remodel

If you’re planning to remodel your entire kitchen in 2025, one of the most common questions is: “How long will this take?” Whether you’re updating finishes or undertaking a full-scale transformation, understanding the timeline for an entire kitchen remodel is essential.

At Kitchen Search, we emphasize proper planning and setting realistic expectations because every successful kitchen remodel project starts with a solid, well-thought-out time frame.

Kitchen renovation and home renovation projects can vary depending on numerous factors. From your initial design meetings to the final walk through, knowing the stages helps you manage expectations and avoid unexpected delays. This detailed look at the kitchen renovation process will guide you through what to expect.

Kitchen Remodel Timeline: What to Expect at Each Phase

Digital Rendering Of A Modern Kitchen Under Construction, With A Contractor In A Partially Sketched Environment, Showcasing Progress And Cabinetry Layout.How Long Does a Kitchen Remodel Take in 2025? A typical kitchen renovation takes time, spanning several weeks to multiple months. Here’s a breakdown of a full kitchen renovation timeline:

Planning and Design Phase (4–8 weeks)

This phase starts with careful design meetings to define the scope of the project, including decisions about cabinet door style, cabinet hardware, kitchen layout, and possibly making structural changes. This is when we’ll discuss new cabinets, new countertops, hardwood flooring, and whether you’re replacing appliances or even moving plumbing systems. Proper planning here ensures you’re ready for what comes next.

Pre-Construction and Ordering (2–4 weeks)

Once materials are chosen and ordered, stock or custom, the renovation process enters its time-consuming procurement phase. Ordering custom cabinetry, countertop slabs, and other materials like lighting fixtures and cabinet hardware takes time. During this time frame, coordinating contractor availability and applying for permits is critical to ensure you don’t obtain permits late in the game.

Construction and Installation (6–16 weeks, sometimes longer)

This is the most active part of the remodeling process. The construction schedule typically involves:

  • Demolition of walls and removal of old cabinets
  • Making structural updates to support new layout
  • Rough-in plumbing work and electrical work or adding electrical and HVAC work
  • Framing, drywall, and prepping for finishes
  • Installing new cabinets, new countertops, and replacement appliances
  • Custom cabinet door and cabinet hardware installation
  • Hardwood flooring or tile work
  • Backsplash, paint, and final fixture hookups

A small kitchen remodel might finish in six weeks, while a complete gut renovation can stretch to six months, or more, based on project complexity and the contractor availability.

How the Construction Schedule Affects Your Remodel Timeline

Contemporary Kitchen With A Gray Island, White Cabinets, Marble Backsplash, Pendant Lighting, And Stainless Steel Appliances In A Sleek, Minimal Design.Your construction schedule is the roadmap of your remodeling process. From demo to finishing touches, every trade, plumbers, electricians, tile setters, and painters, must be aligned to avoid unexpected delays. At Kitchen Search, we build realistic construction schedules based on material lead times and subcontractor timelines, so your project stays on track.

We also help homeowners understand how external factors, like supplier shortages or permit delays, can influence their specific time frame. That transparency is key to a stress-free kitchen renovation.

Average Timeframes Based on Scope of the Kitchen Remodel Project

Different levels of renovation will yield different overall timelines:

Cosmetic or Minor Remodeling (1–4 weeks)

A small kitchen remodel that only involves painting, new cabinet hardware, lighting, or backsplash may finish within a month. No layout changes, plumbing work, or structural work means minimal disruption and faster completion.

Midrange Kitchen Remodel Project (2–4 months)

A midlevel kitchen renovation includes new cabinets, new new countertops, replacing appliances, possibly hardwood flooring, but keeps the same layout. It may involve electrical work, minor plumbing adjustments, and cabinet upgrades. Expect this to take about 2–4 months.

Complete Kitchen Remodel or Major Renovation (4–6+ months)

A full gut remodel with moving plumbing, changing the layout, installing new cabinets, replacing appliances, making structural changes, custom cabinetry, and hardwood flooring often spans 4–6 months. This longer time frame is driven by the scope of the project, permit delays, and contractor availability.

The Importance of Careful Planning in Kitchen Renovation

Open-Concept Kitchen With Dark Wood Floors, White Cabinetry, Modern Pendant Lights, And Large Windows Looking Out Onto A Green Backyard. Let Me Know If You Want These Optimized For Seo With Keyword Inclusion Or Styled For E-Commerce Platforms.No successful kitchen remodel happens by accident, careful planning is the foundation. It starts with mapping out your kitchen renovation timeline and identifying key decisions early: cabinetry style, materials, appliances, and layout goals.

Failing to prioritize this phase can result in scheduling gaps, rushed decisions, and even added costs. That’s why at Kitchen Search, we spend extra time upfront creating a clear plan, helping clients choose durable finishes, align their budget with expectations, and prepare for lead times on custom items like cabinetry and stonework.

What Impacts the Timeline of a Kitchen Project?

Several factors affect how long a remodel takes:

Project Complexity and Scope of the Project

If you’re adding structural support, reconfiguring your floor plan, or relocating plumbing and gas lines, expect longer timelines. These elements complicate the process and vary depending on complexity.

Obtaining Permits and Local Regulations

Delays in the approval process can add weeks. Local regulations vary widely, so a general contractor with permit expertise helps avoid unexpected delays.

Material Lead Times for New Cabinets and Other Materials

Custom items, especially new cabinets, countertops, stone, and hardwood, can take many weeks to arrive. Stock items are faster but may limit design options.

Contractor Availability and Scheduling

Reliable teams of reputable contractors help ensure your renovation stays on track. Delays occur when contractors juggle multiple projects, so we manage contractor availability carefully.

Plumbing Systems and Essential Plumbing Work

Updating plumbing systems or rerouting piping for an island or sink relocation adds time. Qualified plumbers may have their own schedules to match.

Electrical and HVAC Work

Adding electrical outlets, lighting fixtures, or updating HVAC ducts is essential for a modern layout, and adds to the time frame.

Unforeseen Issues During Demolition

When tearing out old cabinets, hidden damage like mold, wiring problems, or water damage can appear. These unexpected delays are often outside your control, but we handle them effectively.

Kitchen Cabinets: A Major Factor in the TimelinePartially Remodeled Kitchen With White Cabinets, Unfinished Countertops, And Exposed Subflooring, Natural Light Coming Through Windows And A Back Door.

Selecting cabinets early is key. In-stock units can arrive in days. Semi-custom or new cabinets take 6–10 weeks or more. Custom builds extend your timeline but offer the most personalization. Delays in cabinet door designs or hardware choices often stall installation.

How to Keep Your Kitchen Renovation on Track

  • Proper planning with designers and contractors, starting at design meetings
  • Obtain permits early to comply with local regulations
  • Order new cabinets, countertops, and flooring early to avoid lead-time delays
  • Lock in contractor availability ahead of time for seamless transitions
  • Communicate consistently through the remodeling process to address small issues before they grow
  • Choose reputable contractors and a reliable general contractor to coordinate subcontractors

What to Expect During the Final Walk Through

As your renovation nears completion, the final walk through is your last opportunity to confirm everything is completed to your satisfaction. During this phase, our team reviews all workmanship, checks for outstanding tasks, and ensures systems, plumbing, electrical, appliances, are functioning properly.

Any remaining punch list items are noted, corrected promptly, and finalized before your family returns to full use of the space. This close-out phase guarantees that your dream kitchen is not only beautiful but fully functional and safe.

Real Project Examples and Their Average Time

3-Month Remodel with Semi‑Custom Cabinets

This midrange renovation in New Jersey featured semi‑custom cabinets, quartz countertops, and stainless appliances, all while keeping the original kitchen layout intact. Because the homeowners finalized their selections early and worked closely with our team to order materials on time, everything stayed on schedule.

The cabinets arrived when expected, and the rest of the project moved efficiently. With good communication and ordering materials well in advance, this remodel took just over 12 weeks, and ran smoothly from start to finish.

6‑Month Complete Kitchen Remodel with Structural Changes

In Philadelphia, this full gut renovation involved moving plumbing, altering wall placements, installing hardwood flooring, and adding fully custom cabinetry. Due to the project’s scope, a longer timeline was expected, and that’s exactly what was delivered.

With the right planning, securing permits early, and scheduling inspections at the right moments, this entire kitchen renovation process was completed in six months. Because materials were pre-ordered in sync with construction stages and every trade was well-coordinated, the entire remodel ran smoothly, finishing on time and meeting all expectations.

Frequently Asked Questions About Remodel Timelines

What’s the average time for a kitchen renovation?

A typical kitchen renovation takes anywhere from three to six months from the initial design consultation to the final walk through. Of course, this can vary based on the project’s scope, the availability of materials, and how extensive the changes are. A smaller update might wrap in a few weeks, while a full gut renovation with structural work can take several months. Every project is different, and the time it will take to remodel truly depends on the scope.

Can I live in my home during construction?

Yes, you can, but be prepared for some inconvenience. Access to your kitchen will be limited during demolition, new appliance installation, and plumbing or electrical work. Many of our clients set up a temporary cooking area to keep things manageable. We’ll help you plan for this so your daily routine isn’t completely disrupted.

Do final inspections delay moving in?

Sometimes, but not always. Final inspections can add a few extra days at the tail end of the project, but our team schedules them in advance to minimize delays. We understand that realistic expectations are key, and keeping your construction schedule on track is a top priority for us.

How can I avoid unexpected delays?

Start planning early. Finalize your design and materials well in advance. When you order your new cabinets, countertops, or appliances early, you reduce the chance of supply chain issues slowing you down. Most importantly, work with reputable contractors who understand that kitchen remodeling takes time, and who are committed to managing that time efficiently.


Plan Your Remodel with Confidence

Your kitchen isn’t just a room, it’s where life happens. Whether you’re making a few small updates or designing a completely new kitchen, the renovation journey should be exciting, not overwhelming. But like any meaningful transformation, kitchen remodeling takes time.

That’s why we believe in careful planning, honest timelines, and constant communication. Whether your remodel takes two weeks, a few weeks, or a few months, we’re here to guide every phase. From picking out new cabinets to managing the timeline, coordinating trades, and staying ahead of surprises, Kitchen Search has your back.

Ready to get started? Book your free kitchen design consultation with Kitchen Search today and get a personalized kitchen renovation timeline tailored to your vision, your space, and your goals.

You have waited long enough

With 18 months of interest-free financing*, there is nothing standing between you and your dream kitchen.

Special Financing for 18 Months*

Make your dream kitchen possible today – pay over time with special financing.

*Subject to credit approval.

FaceTime Your Kitchen Designer*

or

Participants must be 18+ and U.S residents to join Live. Video calls may be recorded for quality assurance and promotional purposes.

FaceTime Your Kitchen Designer*

or
Participants must be 18+ and U.S residents to join Live. Video calls may be recorded for quality assurance and promotional purposes.
Referral Link Copied to Clipboard